top of page
Brush Stroke for Wix - White.png

OUR HISTORY

1
2
Avedisyan - Мъгърдич Аведисян - Профилна Снимка

Eng. Magardich Avedisyan

2005 - 2013

2014 - 2017

2018 - 2021

2022 - 2023

2024 - today

The director of Avedisyan Eood , Eng. Magardich Avedisyan,
began to deal with construction and repair activities in 2005.

In 2014, he went to London , where he started general work at Longcross construction LTD.

In 2018, he opened his first company - Mavedisyan LTD, which deals
mainly with painting and decoration and will operate until 2021.

After that, he started an auxiliary company - Mdidi LTD, which deals with painting, decorating and cleaning, with which he worked until 2023.

From 2024 he works as a consultant in England and redirects the business to Varna.

3
4
5

During these 9 years, close ties were built in England with one of the largest construction companies there.

Battersea Power Station

Part of the work undertaken by Mavedisyan LTD is a complete repainting of metal staircases in the most expensive apartments on the top floors of the power station. People like Sting and Elton John are owners of such apartments.

The second stage of work undertaken by Mavedisyan LTd was the repainting of all 8 staircases in the main building and all 4 lift lobbies.

The most expensive mixed complex in Europe!

The cost of the project is 9 billion pounds and includes the construction of buildings with a capacity of 4,000 apartments, the restoration and modernization of the power plant, the construction of a subway stop and all this on an area of 42 acres.

Avedisyan - Photo by Nick Fewings on Unsplash
Avedisyan - Photo by Andras Stefuca on Pexels

Newfoundland Tower

Also called the "diamond tower" because of its 58 stories and diamond-patterned steel exoskeleton that structurally supports it.

It is located in the City of London and is
220 meters high , making it the tallest rental building in the United Kingdom.

It is also the first residential building ever to be built on the Canary Wharf private estate, setting it apart among the commercial towers of the financial centre. Its prominent location,
on the banks of the River Thames and at the end of Middle Dock, West India Docks, is directly opposite the main exit of Canary Wharf Jubilee line station and can be seen across the dock from there.

The last 9 floors of the building
painted by Mavedisyan LTD are a source of pride.

LSE Centre Building

LSE stands for London School of Economics.

The London School of Economics' newest building opens in 2019.

Designed by Rogers Stirk Harbor and Partners following an RIBA competition.


The building has 13 floors and includes:
- 14 seminar rooms with between 20 and 60 seats
- 234 places to study
- Auditorium with 200 seats
- As well as three lecture halls

Avedisyan - Photo by Shadowssettle on Wikipedia
Brush Stroke for Wix.png
Brush Stroke for Wix.png

Our Values -

Avedisyan - Logo - Строителни Ремонти
Brush Stroke for Wix.png

Skills

Avedisyan believes that the key to the success of a fast and quality renovation is in the plan and management of the project.

Experience in England and certificates (which you can see below) guarantee
a high level of performance.

Each one of our workers has gone through internal training in order to achieve the maximum in a certain task.

Specialization

Thanks to 9 years of experience in England, Avedisyan is highly specialized in working with any type of paints :

- Latex
- Washable paints
- Floor paints
- Paints for concrete
- Brick paints
- Magnetic paints
- Thermal paints
- Two and Three component
- Others

Relevance

Avedisyan constantly monitors new products coming to the market such as materials, their way of working and new tools.

In addition to the correct selection of personnel, a very important part is
the tools and their correct use.

We rely mainly on machines to save time.
Thus, with a small number of people, we provide
the best possible results and fast execution times.

Brush Stroke for Wix.png
Avedisyan - Сертификат (Pro Qual - NVQ Level 2) на Мъгърдич Аведисян - Строителни Ремонти

Certificates

National Professional Qualification Level 2 (NVQ Level 2)

All the work put in is unthinkable without certificates issued by our workers, guaranteeing compliance with all stages, safe work and quality control.

NVQ Level 2 involves carrying out complex job duties and gaining a good knowledge and understanding of an area.

Exam activities take place in a variety of contexts - involving
a combination of individual responsibility and teamwork.

Brush Stroke for Wix - Small.png
bottom of page